MTech Projects
  • HOME
  • MTECH PROJECTS
    • COMPUTER SCIENCE
      • MTech Python Projects
        • Machine Learning Projects
        • Deep Learning Projects
        • Blockchain Projects
        • django Projects
      • MTech Java Projects
        • Cloud Computing Projects
        • Data Mining Projects
        • Mobile Computing Projects
        • Networking Projects
      • MTech NS2 Projects
        • Wireless Communication Projects
        • Vehicular Technology Projects
      • MTech Hadoop Projects
      • MTech Android Projects
    • ELECTRONICS
      • MTech DSP Projects
      • MTech DIP Projects
      • MTech VLSI Projects
      • MTech Communication Projects
    • ELECTRICAL
      • MTech Power Systems Projects
      • MTech Power Electronics Projects
      • MTech Control Systems Projects
    • OTHER
      • Chemical Projects
      • Mechanical Projects
      • All Other Projects
  • EMBEDDED KITS
    • MTech Embedded Kits
    • BTech Embedded Kits
  • PROJECTS+
  • PUBLISHING
    • Research Publishing
    • Authors Guidelines
    • Publishing Policy
  • CONTACT US

Contact Us

  • Street Number 4, Jawahar Nagar, RTC X Road, Hyderabad 500044
  • +91 9573777164
  • info@mtechprojects.com

Welcome to MTech Projects - Online Projects for MTech Students

  • My Account
  • Careers
  • Downloads
  • Blog
MTech Projects
  • Email Us
  • Phone Number
  • Open Hours
  • HOME
  • MTECH PROJECTS

    MTech Python Projects

    • Machine Learning Projects
    • Deep Learning Projects
    • Blockchain Projects
    • django Projects

    MTECH JAVA PROJECTS

    • Cloud Computing Projects
    • Data Mining Projects
    • Mobile Computing Projects
    • Networking Projects

    MTECH NS2 PROJECTS

    • Wireless Communication Projects
    • Vehicular Technology Projects
    • MTech Hadoop Projects
    • MTech Android Projects

    ELECTRONICS

    • MTech DSP Projects
    • MTech DIP Projects
    • MTech VLSI Projects
    • MTech Communication Projects

    ELECTRICAL

    • MTech Power Systems Projects
    • MTech Power Electronics Projects
    • MTech Control Systems Projects

    OTHER

    • Chemical Projects
    • Mechanical Projects
    • All Other Projects
  • EMBEDDED KITS
    • MTech Embedded Kits
    • BTech Embedded Kits
  • PROJECTS+
  • PUBLISHING
    • Research Publishing
    • Authors Guidelines
    • Publishing Policy
  • CONTACT US

Project Enquiry

  1. You are here:  
  2. Home
  3. MTech Java Projects
  4. Resource Scheduling and Delay Analysis for Workflow in Wireless Small Cloud - 2018
Details
Category: MTech Java Projects
By MTech Projects
MTech Projects
28.Nov
Hits: 62

Resource Scheduling and Delay Analysis for Workflow in Wireless Small Cloud - 2018

PROJECT TITLE :

Resource Scheduling and Delay Analysis for Workflow in Wireless Small Cloud - 2018

ABSTRACT:

This Project studies resource scheduling for wireless tiny cloud assuming that the execution of an application is modeled as a workflow graph. A scheduling methodology is proposed which consists of two elements. For the task-to-computing-unit assignment part that operates on the long-term time-scale, the answer is to partition the workflow into task groups that have loose data transfer constraint and every task cluster is assigned to the computing unit that can finish executing the task group at the earliest time. For the computing and wireless Communication resource scheduling part which operates on the short-term time-scale, we have a tendency to merely use the spherical-robin principle. A half by part delay part estimation methodology is presented based on that the typical delay performance will be analyzed. Simulation results validate the theoretical analysis and show that the proposed technique outperforms existing methods. The impact of various parameter settings on the system performance is additionally investigated.

Did you like this research project?

To get this research project Guidelines, Training and Code... Click Here

  • User-Centric Network MIMO With Dynamic Clustering - 2017
  • Mining Health Examination Records — A Graph-based Approach - 2016
  • Flexible Rollback Recovery in Dynamic Heterogeneous Grid Computing
  • A Chat Application in Lift
  • Topological Properties of Secure Wireless Sensor Networks Under the q-Composite Key Pre-distribution Scheme With Unreliable Links - 2017
  • Space-Efficient Verifiable Secret Sharing Using Polynomial Interpolation - 2018
  • Building and Querying an Enterprise Knowledge Graph - 2017
  • AMES-Cloud A Framework of Adaptive Mobile Video Streaming and Efficient Social Video Sharing in the Clouds - 2013
  • Two-Cloud Secure Database for Numeric-Related SQL Range Queries with Privacy Preserving - 2017
  • Dual-Link Failure Resiliency Through Backup Link Mutual Exclusion
Previous article: Pricing for Past Channel State Information in Multi-Channel Cognitive Radio Networks - 2018 Pricing for Past Channel State Information in Multi-Channel Cognitive Radio Networks - 2018 Next article: Mercury: An Infrastructure-Free System for Network Localization and Navigation - 2018 Mercury: An Infrastructure-Free System for Network Localization and Navigation - 2018
COMPUTER SCIENCE PROJECTS MTech Python Projects MTech Java Projects MTech .Net Projects MTech NS2 Projects MTech Android Projects MTech Hadoop Projects ELECTRONICS PROJECTS ELECTRICAL PROJECTS EMBEDDED PROJECTS MECHANICAL PROJECTS

sell academic m.tech, btech and be projects online

sell academic m.tech, btech and be projects online

Academic Final Year Projects

QUICK LINKS

  • Python Projects
  • Java Projects
  • Android Projects
  • Digital Signal Processing
  • Image Processing Projects
  • VLSI Projects
  • Power Systems
  • Power Electronics
SUPPORT
+91 9573777164
9:00am - 6:00pm IST
info@mtechprojects.com

Navigate

  • ABOUT
  • TESTIMONIALS
  • FIND A DEALER
  • CAREERS

CONTACT

  • CONTACT
  • FAQ
  • RESOURCES
  • EMAIL US

Useful links

  • REFUND & RETURN POLICY
  • PRIVACY POLICIES

Support

  • FACEBOOK
  • TWITTER
  • PINTEREST
  • GOOGLE PLUS

Disclaimer : MTech Projects, is not associated or affiliated with IEEE, in any way. The mentioned IEEE Projects here are student projects inspired by ideas from IEEE publications, not projects conducted by or associated with IEEE.

Talk to us?

Copyright © 2009 - 2026 MTech Projects. All Rights Reserved.
CALL NOW
ASK EXPERT